Detail 70mai Hardwire Kit UP04 Untuk Omni Parking Monitor 4G Live Control
Route Tracking: Use the 4G Hardwire Kit, you can access a route-tracking map synced to 70mai Cloud* through 70mai App after each trip.
Digunakan untuk : 70mai Omni X200
Please connect each sub-line of the parking monitoring line to the fuse box in the following: 1. The power cord (red) is connected to a normal fuse with an input voltage of 12V-30V and an output current of 2.4A in the fuse box; 2. The ACC signal wire (yellow) is connected to the ACC power fuse in the fuse box; 3. The ground wire (black) is connected to the negative pole of the fuse box or the grounding position